The installation at a glance.
- 2
- Separate installations
- 15 kWh
- Server-room battery capacity
- 30 kWh
- Office battery capacity
- 2 × 15 kWh nameplate capacity
Server room · October 2026
- Inverter
- 10 kVA
- Battery
- 15 kWh lithium
- Solar PV
- Not listed
Office · November 2026
- Inverter
- 12 kVA MUST
- Battery
- 2 × 15 kWh lithium
- Solar PV
- Not listed
The requirement.
A server room and a general office serve different activities and can require different power arrangements. PiggyTech's project covered these environments as two separate installations, rather than treating the premises as one undifferentiated load.
The recorded requirement was to provide inverter and lithium battery equipment for the server room in October 2026 and for the office in November 2026. The source does not specify equipment loads, a guaranteed autonomy period or measured service availability.
How the solution came together.
The server-room installation combined a 10 kVA inverter with 15 kWh of lithium battery storage. This provided a dedicated inverter-and-storage configuration for that part of the business.
The office installation used a 12 kVA MUST inverter and two 15 kWh lithium batteries. Those battery nameplate capacities total 30 kWh. Keeping the two installations distinct makes the delivered capacity in each environment clear without suggesting that their inverters form a single combined system.
- Server room: 10 kVA inverter and 15 kWh lithium battery storage.
- Office: 12 kVA MUST inverter and 2 × 15 kWh lithium batteries.
The delivered scope.
PiggyTech received two separately specified inverter and lithium storage installations for its server room and office. The office battery configuration has a larger recorded nameplate energy capacity than the server-room configuration, reflecting the distinct equipment selections.
This is a documented backup-power project. Although the source document groups it with solar projects, neither the case-study scope nor the installation register lists solar panels for these two installations. No PV capacity, verified uptime improvement or operating-cost reduction is claimed.